It is the construction work of the 12 and 18 meter highways of the Hawary Shar Project.
-
Green area
-
Garden & Terrace
-
Close to School
-
Near Hospital
It is the construction work of the 12 and 18 meter highways of the Hawary Shar Project.
Within the scope of this project, 3 built-in reinforced concrete water tanks and a pump building and 10 prefabricated additional buildings were built.
The construction of the central sewerage network and treatment plant in Şırnak province, which was built by our company by İller Bank, was successfully completed in 2000 and took its place among our reference works.
Erbil Minare Park, designed and built by our company and put into service to the public in June 2006, was established on an area of 73,000 m²; There is a 134 m long waterfall, various water games, Roman Square adorned with ancient columns, an amphitheater, buffets and cafes. in Iraq; This ancient park, where the first automatic irrigation system was built, has become one of the most precious corners of the city, frequented by the people of the city, where artists shoot music videos and frequently used by TV channels for their program shots.
We are proud of completing the Hawary Shar Project, whose aim is to build a complex Touristic City on an area of 5 million m2 in the coolest region of Iraq, in a short time. In the center of this project, which was designed by our company, there is a public park, which is known as the largest park in the Middle East, and a five-star hotel open to investors, motels, camping areas, amusement park, aqua park, sports fields, zoo, restaurant areas around it. Below is a breakdown of the works that we have successfully completed within the scope of this project, with a total cost of 49 million USD.