Hawary Shar Water Tank and Outbuildings

Within the scope of this project, 3 built-in reinforced concrete water tanks and a pump building and 10 prefabricated additional buildings were built.


  • Green area
  • Garden & Terrace
  • Close to School
  • Near Hospital

Government House Construction

The Güçlükonak Government House, which was tendered to our Şırnak Governorship İnce company, was completed in 1999 within the promised time; has taken its place among our reference works.


  • Green area
  • Garden & Terrace
  • Close to School
  • Near Hospital

8 Flats Agricultural Housing

Governorship of Şırnak Ministry of Agriculture and Rural Affairs, which was first tendered, was successfully completed in 1998 and took its place among our reference works.


  • Green area
  • Garden & Terrace
  • Close to School
  • Near Hospital

National Library

In this complex, which was built by our company by the Republic of South Korea with the partnership of Cherxan company, there is a congress building, 35.000 m² green area, parking lot, 1.000KW generator building and transformer building besides the library building consisting of 3 blocks.


  • Green area
  • Garden & Terrace
  • Close to School
  • Near Hospital

School with 24 Classrooms

The plan you see in the picture; It belongs to Shawes College, which we built in Erbil in agreement with the Governor’s Office. Shawes College planned as 24 classrooms; Fast Food Cafe, Tennis Court; It also has an indoor sports field. This 24-classroom school, which has an important place among the needs of the people of Erbil, has been a great service to the people of Erbil when it was completed.


  • Green area
  • Garden & Terrace
  • Close to School
  • Near Hospital

Hawary Shar

We are proud of completing the Hawary Shar Project, whose aim is to build a complex Touristic City on an area of 5 million m2 in the coolest region of Iraq, in a short time. In the center of this project, which was designed by our company, there is a public park, which is known as the largest park in the Middle East, and a five-star hotel open to investors, motels, camping areas, amusement park, aqua park, sports fields, zoo, restaurant areas around it. Below is a breakdown of the works that we have successfully completed within the scope of this project, with a total cost of 49 million USD.

  • Vegetation of 2 million m2 area
  • Main roads, pedestrian roads, culverts, bridges
  • Electrical network and lighting of 5 million m2 area
  • Sound and Announcement system controlled from a single center
  • Drinking water network, transmission line, warehouses, pumping centers
  • Sewage and drainage network
  • Main irrigation water line and tanks
  • Automatic Irrigation System (2 million m2) controlled from a single center
  • Two large Waterfalls with a total area of 7000-m2
  • Ponds, ornamental pools, fountain systems
  • 2000m. a long artificial stream
  • Park buildings
  • Fire extinguishing network throughout the area

  • Green area
  • Garden & Terrace
  • Close to School
  • Near Hospital